-
Posts
1,388 -
Joined
-
Last visited
Content Type
Profiles
Forums
Events
Gallery
Store
Media Demo
Quilting Resource Links
Everything posted by Joy-in-Illinois
-
Finally back to quilting. Dishwasher sprung a leak and I had to tear out kitchen floor, dry everything out which took 6 days, and then have new flooring, dishwaher, and disposal installed. Got a new backsplash out of the deal, too; but it put a serious crimp in my quilting time
-
The laminate flooring is installed, waiting to get the trim installed. In the meantime, my frame is dismantled; so, I am getting some quilt tops of my own worked on while I wait for things to get back to normal.
-
OH MY GOODNESS!!!!! Thank you for letting me know!!!! I'm planning on being there around noon today. I'll ask around for you. Thanks again!!!